Access the Full Project by Clicking here!
Bidjugde
JOB
Wtcpua 1080 24 Inches Transmission Main Segment B
BID DATE
02/13/24 - 1:00
AGENCY
West Travis County PUA
ESTIMATE
n/a
SCOPE
The WTCPUA 1080 24" Transmission Main - Segment B project is a 24" water line that will be ~9,500 feet in length. The line will start near Skaggs Dr along Bee Cave Pkwy, traveling through multiple easements, before boring across Hwy 71. After crossing Hwy 71, it will parallel it until it reaches Hamilton Pool Rd. It will continue aling the road, within easements and the Hamilton Pool Road ROW, where it will then bore across Hamilton Pool Road, then it will travel through easements until it will connect to an existing Bee Cave Pump Station facilites. https://www.civcastusa.com/project/65a83e706dd7b503b0bafca0/plans ajohnson@murfee.com
PREBID
1/31/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT