Access the Full Project by Clicking here!
Bidjugde
JOB
Tutt Blvd Extension Dublin Templeton Gap
BID DATE
02/16/24 - 4:00
AGENCY
Colorado Springs
ESTIMATE
$2,500,000
SCOPE
This work shall consist of temporary measures needed to control erosion and water pollution. These temporary measures shall include, but not be limited to, berms, dikes, dams, sediment basins, fiber mats, netting, gravel, mulches, grasses, slope drains and other erosion control devices or methods https://www.bidnetdirect.com/colorado/solicitations/open-bids/Tutt-Blvd-Extension-Dublin-to-Templeton-Gap/0000339925?purchasingGroupId=8409951&origin=2 michael.zeller@coloradosprings.gov
PREBID
1/25/2024 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT