Sinton Trail South Douglas Creek Repairs
BID DATE
01/31/24 - 4:00
AGENCY
Colorado Springs
ESTIMATE
$1,500,000
SCOPE
The work to be done by the Contractor shall consist of removal of existing riprap protection, sheet pile driving, substantial grading work inside and outside of the channel, installing riprap and grouted boulders throughout the project extents, installation of a proposed 4’ grouted boulder drop structure 3 tiered, and other misc. work. T https://www.bidnetdirect.com/colorado/solicitations/open-bids/Sinton-Trail-South-Douglas-Creek-Repairs/0000338708?purchasingGroupId=8409951&origin=2 michael.zeller@coloradosprings.gov