Sewer Replacement Alley
BID DATE
03/7/24 - 2:00
AGENCY
Turlock
ESTIMATE
$251,210
SCOPE
In general, the work consists of removing 384 LF of 6” VCP and replacing it with 8” PVC SDR-26, connecting sewer service laterals, utility trenching, trench patching, modifying manhole bases to match inverts, cutting and capping sewer laterals, constructing a valley gutter, an alley approach, CCTV inspection, a sewer bypass system and other associated work. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as shown on the contract plans. omolina@turlock.ca.us engineering@turlock.ca.us