JOB
East Mesa Water System Improvements Phase 1
BID DATE
02/7/24 - 2:00
AGENCY
Lower Rio Grande PWWA
ESTIMATE
n/a
SCOPE
Demolition of three welded steel water storage tanks, rehabilitation of seven welded steel storage tanks, and construction of a new 200,000-gallon welded steel tank. Installation of approximately 2,800 feet of 6-inch waterline, along with reconnections of existing water service lines. Upgrades to existing Butterfield booster station, to include the installation of four variable frequency drives and replacement of existing pumps. All of the piping, including flow meters and the altitude control valve, will be replaced in a vault at the Butterfield site. SCADA master controls will be relocated from the NW well site to the Butterfield Park office. https://www.ariplans.com/jobs/1380/details/lrgpwwa-east-mesa-water-system-improvements-project-phase-1