Access the Full Project by Clicking here!
Bidjugde
JOB
Street Rehabilitation FY 2015
BID DATE
03/3/15 - 2:00
AGENCY
Berkeley
ESTIMATE
$2,700,000
SCOPE
The work to be done consists, in general, of resurfacing approximately 17,900 linear feet of paved street. This includes removal of existing pavement and base rock adjacent to the curb, gutter, or brick, as required, cleaning of street as necessary, repair of failed areas, leveling, asphalt concrete surfacing, double fiberized microsurfacing, adjusting to grade such City structures as are affected by the street rehabilitation, traffic striping, pavement marking, signage, curb ramps, iron adjustment and traffic control. All work shall be performed in accordance with these plans and specifications. Wendy Wong, Assistant Public Works Engineer via email at wwong@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT