Grant Ave Bridge Rehab
BID DATE
02/6/24 - 2:00
AGENCY
Novato
ESTIMATE
$2,728,620
SCOPE
All of the work to be performed is within the City of Novato and generally consists of transportation and pedestrian improvements on Grant Avenue. Work includes demolition of a portion of the existing bridge, sidewalks, curb and gutter and cold planing the existing roadway surface, along with construction of a new bridge structure, new curb and gutter, accessible curb ramps, asphalt overlay, storm drain, street lighting and revegetation planting. The primary focus of this project is to widen and rehabilitate the existing bridge to accommodate bike lanes and sidewalks, replace substandard bridge railings, and stabilize the banks and channel of Novato Creek to minimize scouring of bridge foundations. gwoodfin@novato.org