Access the Full Project by Clicking here!
Bidjugde
JOB
Locust Street Rehabilitation
BID DATE
01/18/24 - 2:30
AGENCY
Walnut Creek
ESTIMATE
$1,750,000
SCOPE
The Project includes, but is not limited to, performing the following Work: • Traffic Control • Concrete Removal • Tree Removal • Drainage Improvements • Conduit Installation • Concrete Curb, Gutter, Sidewalk, Driveways, and Curb Ramps. • Base Repairs • Cold Plane / Milling Asphalt Concrete Pavement of 0.25' (3") • Hot Mix Asphalt Type A Paving (0.25' (3") • Utility Adjustment • Traffic Striping and Markings • Decorative Pavement Markings • Landscape • Signage • Electrical (Conduit, Pullbox and Loop Detectors) This Project is on the following streets in the City of Walnut Creek: Locust Street between Civic Drive and Mt. Diablo Boulevard. hawthorne@walnut-creek.org https://qcpi.questcdn.com/cdn/posting/?group=8014976&provider=8014976&projType=all

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT