Access the Full Project by Clicking here!
Bidjugde
JOB
Dransfeldt Road Extension
BID DATE
12/21/23 - 2:00
AGENCY
Parker
ESTIMATE
n/a
SCOPE
Construction of approximately 4,000 feet of new collector roadway for the extension of Dransfeldt Road from the Twenty Mile intersection, crossing Cherry Creek and connecting to Motsenbocker Road plus reconstruction of Motsenbocker Road east of the Todd Drive intersection. Included with this roadway construction, but not limited to, will be an approximate 700-foot long, 6-span bridge (2-lanes), approximately 14,000 tons of hot mix asphalt, storm sewer drainage (culvert, drainage swale and water quality ponds) improvements with associated inlets/manholes, a 140-foot long double concrete box culvert, upgrades to one (1) traffic signal, waterline installation/relocations, earthwork, aggregate base course, concrete flatwork, signage, pavement markings, traffic control and seeding/mulching work. https://www.bidnetdirect.com/colorado/town-of-parker/solicitations/DRANSFELDT-ROAD-EXTENSION/0000335762?purchasingGroupId=8409951&origin=2 chudson@parkeronline.org
PREBID
12/5/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT