Access the Full Project by Clicking here!
Bidjugde
JOB
Tierrasanta Improv 2
BID DATE
02/8/24 - 2:00
AGENCY
San Diego
ESTIMATE
n/a
SCOPE
This project consists of the replacement of approximately 122 LF of existing 8-inch PVC sewer main and the trenchless rehabilitation of approximately 7,608 LF (1.44 Miles) of existing 8-inch sewer mains, including the associated sewer laterals (Approximately 188) from the sewer main to the property line. Furthermore, this project will rehabilitate approximately 29 manholes, perform 14 point repairs, replace 2 existing manholes, install 6 cleanouts, 1 manhole, and several sewer lateral cleanouts as necessary to complete the lateral lining work. Lastly, this project will be replacing 1 commercial concrete driveway, install 2 Continental crosswalks, remove and replace 9 type E traffic signal loops, 5 modified type E loops and 1 type Q loop, install 2 type D curb ramps, and relocate 2 pedestrian push buttons. Ron McMinn 619-533-4618 rmcminn@sandiego.gov
PREBID
1/11/2024 11:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT