Access the Full Project by Clicking here!
Bidjugde
JOB
Red Horse Park Improvements Parking Lot 1
BID DATE
01/25/24 - 2:00
AGENCY
Universal City
ESTIMATE
n/a
SCOPE
The work, in general, consists of the following: Installation of Storm Water Pollution Prevention Measures Removal of existing asphalt, concrete, and concrete curb. Earthwork, excavation, and compaction of areas to be paved Installation of base material. Construction of concrete curb and flatwork. Installation of Asphalt Pavement Installation of signage and striping. Establish site vegetation. Site Cleanup and Removal of Temporary BMPs https://www.civcastusa.com/project/6582fd628e0f41e507a1882f/summary 6seng@6s-engineering.com
PREBID
1/11/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT