Plum Creek Phase 2
BID DATE
02/1/24 - 2:00
AGENCY
Kyle
ESTIMATE
n/a
SCOPE
Construction of new road facilities Avenue A, Cromwell, and Heroes Memorial Drive roads (2,600 LF), Signage and Striping, TxDOT driveway connections (2), Back-of-Curb Landscape Improvements, Cultural Trail, Storm Sewer and Collection System (2,200 LF), Sanitary Sewer Infrastructure (1,200 LF), Water Infrastructure (2,700 LF), Dry Utilities – Electric and Telecommunications (2,200 LF), Streetlighting, and Erosion Control Measures as shown on drawings. Misc.: Clearing & Grubbing and Existing Utility Removal as shown on drawings. https://www.civcastusa.com/project/65833f5e6f5f5204d637f330/summary aron.trevizo@wginc.com
PREBID
1/11/2024 2:00