Access the Full Project by Clicking here!
Bidjugde
JOB
South Mission Beach Storm Drain Green Infrastructure (REBID)
BID DATE
07/11/24 - 2:00
AGENCY
San Diego
ESTIMATE
$26,400,000
SCOPE
WA Rasic Construction Co. - $65,816,858 Construction of South Mission Beach Storm Drain and Green Infrastructure consists of the installation of storm drain throughout various sections of South Mission Beach including Mission Boulevard, San Fernando Place, San Gabriel Place, Capistrano Place, Cohasset Court, and Balboa Court. Construction also consists of storm drain laterals through the alley sections along Mission Boulevard. The pipe size installation will range from 48 inches, 36 inches, 30 inches, 24 inches, and 18 inches. Installation of storm drain appurtenances, water quality basins, low flow diversion structures, slide gate, street resurfacing, curb ramps, landscape and irrigation, and all other incidental work and appurtenances in accordance with these specifications. Brittany Friedenreich 619-533-3104 bfriedenreic@sandiego.gov https://vendors.planetbids.com/portal/17950/bo/bo-detail/117427#
UPDATES