Access the Full Project by Clicking here!
Bidjugde
JOB
Great America Parkway Mission College Boulevard Intersection
BID DATE
01/25/24 - 3:00
AGENCY
Santa Clara
ESTIMATE
n/a
SCOPE
The Work is comprised of the following construction activities: slurry seal, repair of failed pavement (deep-lift), cold planing of existing pavement, and hot mix asphalt, replacement of traffic signals and installation of new advanced loops and video detection systems, installation of new street lighting, concrete curb, gutter, sidewalk, driveway and median island improvements, storm drainage improvements, installation of stormwater treatment measures, adjusting of valve boxes, manholes, pull boxes and other surface utility features, resetting of street survey monuments, replacement and installation of accessible concrete curb ramps, and traffic markers, striping and pavement markings. The work also includes mobilization/demobilization, traffic control, permitting and agency coordination, and other incidentals necessary for complete and usable street facilities. BCoco@santaclaraca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT