Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2023 24 Annual Major Streets Rehabilitation Program First Street Enchanted Way 900 Feet South
BID DATE
01/23/24 - 3:30
AGENCY
Simi Valley
ESTIMATE
n/a
SCOPE
The Major Streets Rehabilitation Program (Program) will consist of: 1) 69,638 S.F. of asphalt pavement cold milling; 2) removal and installation of 57 Traffic Signal Loops; 3) placement of 1,200 tons of asphalt concrete surface course overlay; 4) removal, replacement, and disposal of seven (7) water valve boxes; 5) removal, disposal, and replacement of four (4) sewer manhole frames, rings and covers; 6) adjustment of one (1) storm drain manhole to grade; 7) adjustment of one (1) Ventura County survey monument to grade; 8) 5,041 total L.F. (CalTrans) and 576 L.F. (City) of traffic signing and pavement delineation; 9) installation of 12” white crosswalk or limit line; 10) construction surveying; and 11) all appurtenant work. akhandaker@simivalley.org https://www.simivalley.org/Home/Components/RFP/RFP/155/169

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT