Access the Full Project by Clicking here!
Bidjugde
JOB
Sanitary Sewer Phase 96 Rehabilitation
BID DATE
01/17/24 - 1:00
AGENCY
Clear Lake City Water Authority
ESTIMATE
n/a
SCOPE
In general, this work consists of: 1. Pre-televising and cleaning of sanitary sewer lines that are to be repaired by cured-in-place pipe. 2. Cleaning and preparation of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, existing utility cables etc. 3. Rehabilitation of sanitary sewer lines by cured-in-place pipe installation. 4. Repair of sanitary sewer manholes including cementitious lining, removing and replacing frames and covers, locating sanitary sewer manholes, raising sanitary sewer manholes, grouting exterior of manhole frames, and removing and replacing vent pipe for sanitary sewer manholes. 5. Bypass pumping, to properly rehabilitate any sanitary sewer lines and manholes where a flow through bridge or plug is not a viable option. The cost for flow through bridges or plugs shall be included in other work items. 6. Coordinating with District Operations Staff and Engineer to reduce and maintain flow from lift stations into sanitary sewer manholes in order for rehabilitation work to be performed. 7. Site restoration including removing and replacing concrete sidewalks and pavement including driveways, roadways, curb, gutter, damaged turf, plants, shrubs, fences and trees, as required. 8. Implementation and maintenance of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. https://www.civcastusa.com/project/6573965bf1467ad156b93cf8/summary jlcontreras@lan-inc.com
UPDATES