Carter Creek Force Main Lift Station
BID DATE
01/17/24 - 2:00
AGENCY
College Station
ESTIMATE
n/a
SCOPE
This project will construct a 4 MGD lift station inside the Carter Creek WWTP. Construction of the lift station will inlcude pumps, SCADA equipment, and electical building for VFDs. It will also construct approximately 9,950 feet of 20-inch HDPE force main by open cut and approximatly 3,400 feet of 20-inch fusible HDPE force main by horizontal directional drill. The force main will extend from the new left station, through the WWTP into existing easments and tie into an extension manhole at the end of the Green Jay Drive cul-de-sac in Bird Pond Estates. All proposals shall follow the format provided by the City of College Station. The City is seeking a construction company with quality experience in installing large lift stations, large diameter force mains, and installing and setup of SCADA systems and VFDs.
PREBID
1/5/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT