Burton Way Bikeway Improvements
BID DATE
01/19/24 - 2:00
AGENCY
Beverly Hills
ESTIMATE
n/a
SCOPE
In general, the project consists of asphalt pavement (2-inch grind and overlay), curb ramp replacements, bus pad installation, replacement of existing pavement striping and markings with the current Caltrans standard striping, removal of existing striping and markings as applicable, placement of thermoplastic and traffic-rated paint, and installation of new bikeway striping. The proposed improvement is along Burton Way from Crescent Drive to Robertson Boulevard. Some project locations will require the work to be performed at night, on weekends, or with other working hour restrictions. Christine Chung, 310-285-2516 cchung@beverlyhills.org https://pbsystem.planetbids.com/portal/39493/bo/bo-detail/111842