Access the Full Project by Clicking here!
Bidjugde
JOB
C Street Western Avenue First Street Steven Street Evelyn Avenue Richard Avenue
BID DATE
01/9/24 - 2:00
AGENCY
Brawley
ESTIMATE
n/a
SCOPE
The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The improvements on C Street from the intersection of Western Avenue to the intersection of First Street consist of micro milling ½-inch (0.04 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 47 feet after micro milling activities have been completed. The contractor shall install a 0.75-inch (0.06-foot) conventional ½-inch hot mix asphalt leveling course. The Contractor shall then install an approved paving mat. After the installation of the approved paving mat, the contractor shall install a 1-inch (0.08 feet) ½-inch asphalt rubber hot mix. The improvements also consist of the installation of a handicap ramp. The improvements on Steven Street from the intersection of Richard Avenue to the intersection of Evelyn Avenue and Ronald Street from the intersection of Richard Avenue to the intersection of Evelyn Avenue consist of micro-milling ½-inch (0.04 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 37 feet. After micro milling activities have been completed the contractor shall install a 0.75-inch (0.06 feet) conventional ½ inch hot mix asphalt leveling course. The contractor shall then install an approved paving mat. After the installation of the approved paving mat, the contractor shall then install a 1-inch (0.08 feet) of ½ inch asphalt rubber hot mix. The improvements also consist of the installation P.C.C. handicap ramp and sidewalk. agutierrez@brawley-ca.gov
PREBID
12/19/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT