Access the Full Project by Clicking here!
Bidjugde
JOB
Street Improvements Various Location
BID DATE
01/9/24 - 2:30
AGENCY
Brawley
ESTIMATE
n/a
SCOPE
The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The street improvements at various locations 2nd Street from the intersection of K Street to the intersection of Malan Street, H Street from the intersection of South Las Flores Drive to the intersection of South Rio Vista Avenue, and 3rd Street from the intersection of River Drive to the intersection of A Street. The improvements consist of asphalt concrete header cut 1 inch and 5 feet wide. After header cut activities have been completed the contractor shall install a 0.75-inch (0.063 feet) conventional ½ inch hot mix asphalt leveling course. After the contractor installs the leveling course, they will install a 1-inch (0.083 feet) of 1/2 -inch asphalt rubber hot mix. The improvements also consist of a single adjustment of water valves and sewer manholes with a new concrete collar. Improvement on C Street from the intersection of North 1st Street to the intersection of North Imperial Avenue consists of micro milling ½-inch (0.004 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 47 feet. After micro milling activities have been completed the contractor shall install a 0.5-inch (0.04 feet) conventional 3/8-inch hot mix asphalt leveling course on the thru lanes only. The contractor shall install a 1-inch (0.0833 feet) ½-inch asphalt rubber hot mix. The improvements also consist of the installation of P.C.C. Handicap ramps and double adjustment of water valves and sewer manholes with new concrete collars. agutierrez@brawley-ca.gov
PREBID
12/19/2023 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT