Asphalt Overlay Group 1502
BID DATE
03/20/15 - 2:00 LIVE!
AGENCY
San Diego
ESTIMATE
$11,500,000
SCOPE
Asphalt Overlay Group 1502 involves furnishing all labor, materials,equipment, services and construction, which include placement of asphalt concrete, replacingtraffic signals detection loops and stub outs, adjustment of city manhole and gate valvecovers, cold milling, pavement base repair, installation of curb ramps to meet ADArequirements, street and sidewalk sweeping, tree trimming, replace traffic striping andmarkings / legends, possible night and weekend work, traffic control drawings & permits,storm drain inlet protection and the installation of inlet markers, and sediment control. Eleida Felix Yackel - 619-533-3449 efelixyackel@sandiego.gov