JOB
METRO Connection Force Main Lift Station
BID DATE
01/19/24 - 2:00
AGENCY
Fort Lupton
ESTIMATE
n/a
SCOPE
Installation of 20” PVC force main including appurtenances such as valving and vaults including a section of 24” HDPE to be installed by Horizontal Directional Drilling (HDD). Installation of a short section of 20” PVC gravity sewer and associated manhole. Construction of a lift station utilizing some existing infrastructure at the Fort Lupton Wastewater Treatment Facility. Lift Station will generally include a wet well, pump station, and flow meter vaults to be constructed. Roy Vestal 7204666109 rvestal@fortluptonco.gov Ryan Brong 484-634-2774 rsbrong@burnsmcd.com https://www.bidnetdirect.com/colorado/solicitations/open-bids/METRO-Connection-Force-Main-and-Lift-Station/0000335863?purchasingGroupId=8409951&origin=2
UPDATES