Access the Full Project by Clicking here!
Bidjugde
JOB
Laird Timber Bridge Const BRM322-040 C25866-COMBO
BID DATE
11/28/23 - 1:00
AGENCY
CDOT
ESTIMATE
n/a
SCOPE
The project consists of removing and replacing two timber structures on US 34 East of Laird, CO. This includes the construction and removal of a one lane on-site detour that will utilize temporary traffic signals to control the flow of traffic. Other items include conventional bridge construction, phased roadway reconstruction, riprap placement, monitoring of erosion control measures during construction, final site stabilization, pavement marking, and delineation.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT