Access the Full Project by Clicking here!
Bidjugde
JOB
Alvarado 2nd Extension Pipeline
BID DATE
01/18/24 - 2:00
AGENCY
San Diego
ESTIMATE
$127,000,000
SCOPE
The project consists of the construction of approximately 2.17 miles (11,500 LF) of 24-inch welded steel pipeline and approximately 4.26 miles (22,500 LF) of 48-inch welded steel pipeline and associated appurtenances from West Mission Bay Drive and Sea World Drive to east I-805, along Friars Road. This project also includes the replacement of approximately 1.64 miles (8,650 LF) of existing 12-inch asbestos cement water distribution main along Sea World Drive and approximately 2.10 miles (11,100 LF) of 16-inch asbestos cement water distribution main along Friars Road and Fashion Valley Road with new 12-inch and 16-inch PVC distribution mains. The work includes trenchless construction within Caltrans right-of-way limits at State Route-163, open-cut construction within Caltrans right-of-way limits at the I-5 and I-805 overpass crossings and new Bikeway Improvements. The project will also include construction of a new 536/390 Pressure Reducing Station. The work includes associated cathodic protection, street resurfacing, curb ramps, and all other incidental work. (B-22025 Alvarado 2nd Extension Pipeline Bikeway Improvements) The project consists of Bike Lane Improvements along Sea World Drive (between Mission Bay Blvd and Pacific Highway), Friars Road (between Sea World Dr and Fresno St) and Fashion Valley Rd Brittany Friedenreich 619-533-3104 bfriedenreic@sandiego.gov https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/111884
UPDATES