Access the Full Project by Clicking here!
Bidjugde
JOB
Roads Drainage Improvements
BID DATE
12/6/23 - 2:00
AGENCY
Sour Lake
ESTIMATE
n/a
SCOPE
The project scope for the Base Bid includes but is not limited to: South Fannin Street Roadway Acquire any necessary permits Mobilize and prepare site Install traffic control Remove existing concrete road section Excavation to the proper grade to accept new base material Install, compact and prime new flexible base Complete base repairs as shown in the plans Sweep and tack roadway and construct new HMAC surface Install new side road tie-ins and driveway transitions Backfill pavement edges Clean up site The project scope for the Alternate Bid #1 includes but is not limited to: Shady Lane Roadway Acquire any necessary permits Mobilize and prepare site Install traffic control Excavate for widening areas as shown in the plans Install new flexible base for widening areas Pulverize, mix, shape and compact existing roadway Apply prime coat Construct HMAC surface and driveway transitions Backfill pavement edges Clean up site The project scope for the Alternate Bid #2 includes but is not limited to: Shady Lane Drainage Acquire any necessary permits Mobilize and prepare site Install traffic control Notify residents prior to construction activities Excavate roadside ditches to the line and grades shown in the plans Remove and replace culverts as shown in the plans Repair driveways back to original condition as shown in the plans Seed/hydro mulch disturbed areas Clean up site https://www.civcastusa.com/project/654a75b7d19b946d5701b472/summary swest@leadllc.com
PREBID
11/29/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT