Bernal Avenue 18 inch Water Main F4 Line Turnout No 1 Improvements
BID DATE
12/11/23 - 2:00
AGENCY
Pleasanton
ESTIMATE
$1,550,000
SCOPE
This work will consist of installing approximately 1,300 LF of 18-inch fully restrained ductile iron pipe by open trench and 335 LF of 18-inch fusible polyvinyl chloride pipe by slip lining through an existing 24-inch steel casing. Work also includes appurtenances including flexible expansion joints, valves, combination air valve, service connection, 12- inch pipe reconnection, cathodic bonding of all ductile iron pipe, water main abandonment, and surface restoration. The project also includes rehabilitating Turnout No. 1 located at 2722 Santa Rita Road. Work at Turnout No. 1 includes removing and installing new piping, valving, flow meter and spall repairs to the existing vault. A new 6-inch fire hydrant and piping will be installed adjacent to the vault bcarlson@cityofpleasantonca.gov https://www.bidnetdirect.com/private/solicitations/3468539530/abstract

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT