Trentman Street Bridge Replacement Pavement Improvements
BID DATE
12/14/23 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
The major work will consist of the (approximate) following: UNIT I: WATER IMPROVEMENTS 220 LF 8” PVC Water Line By Open Cut 120 LF 8” DI Water Line By Open Cut 110 LF 20” Casing By Other Than Open Cut 5 EA 8” Gate Valves UNIT II: SANITARY SEWER IMPROVEMENTS 410 LF 8” PVC Sewer Line By Open Cut 70 LF 8” DIP Sewer Line By Open Cut 120 LF 10” DIP Sewer Line By Open Cut 320 LF 18” Sewer Line By Open Cut 4 EA 4’ Manholes with Water Tight Hinged Frame, Cover & Grade Rings 2 EA 4’ Drop Manholes with Water Tight Hinged Frame, Cover & Grade Rings UNIT III: STORM AND CHANNEL IMPROVEMENTS 580 LF Reinforced Concrete Pipe 6 EA Curb Inlets 3,600 CY Excavation (Channel Improvements) 150 CY Site Excavated Fill (Channel Improvements) 1,580 SY Block Riprap, Dry (8” ACB) 800 SY Turf Reinforcing Mat w/ Seeding UNIT IV: PAVING & BRIDGE IMPROVEMENTS 2,610 SY 6” Concrete Pavement 46 TONS Hydrated Lime 2,740 SY 8” Lime Treatment 8 TONS CEMLIME 470 SY 8” Cement Treatment 450 SY 3” Asphalt Type D 5,630 SF 4” Concrete Sidewalk 1 EA Roadway Illumination Pole 430 CY Unclassified Excavation By Plan 2,131 CY Embankment By Plan 890 SF Retaining Wall (MSE) 2,970 SF Reinforced Concrete Slab (HPC) 1,080 LF Drill Shaft (36-In) https://www.fortworthtexas.gov/departments/finance/bids/manual-bids/tranp/2023/100604-trentman-street-bridge-replacement-and-pavement-improvements sandip.uprety@fortworthtexas.gov
UPDATES