Access the Full Project by Clicking here!
Bidjugde
JOB
West Foothill Boulevard Street Improvements Grove Avenue San Bernardino Road
BID DATE
11/28/23 - 3:00
AGENCY
Rancho Cucamonga
ESTIMATE
$5,500,000
SCOPE
The scope of work consists of, but not limited to PCC curb and gutter , median island, PCC access ramps, PCC sidewalk, PCC drive approach, two-way class IV bikeway, concrete median stamped concrete, new traffic signal and controller, modification of existing traffic signals, pedestrian pedestal pole installation, push button, conduit and wiring, fiber optic line, street lighting, storm drain line and catch basins, reconstruction of existing asphalt pavement, irrigations and landscaping, cold milling, weed killing, routing and crack sealing, asphalt rubber hot mix overlay, adjusting existing manholes and valves adjustment to new grade, pavement markers and striping, green bike lane thermoplastic, video detections, construction signs, trees removal, and traffic control plans in phases and other items of work as shown on the plans. https://ciplist.com/plan/?Rancho%20Cucamonga/city/12261/plan/5260

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT