Access the Full Project by Clicking here!
Bidjugde
JOB
La Sal Mountain Loop Road UT FLAP 73
BID DATE
12/19/23 - 2:00
AGENCY
Department Transportation
ESTIMATE
$30,000,000
SCOPE
This project rehabilitates and reconstructs the existing road with minor superelevation correction, profile adjustments, curve widening, ditch reconstruction, culvert replacements, asphalt surfacing, erosion control, signing, and pavement markings. The existing pavement is in poor condition with significant rutting, cracking, and potholing apparent along the route. To complete the proposed widening and realignment, rock and soil cuts and fills are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered. PRINCIPAL WORK ITEMS (Schedule A): 20401-0000 Roadway Excavation: 75,000 CUYD 30101-0000 Aggregate Base: 55,000 TON 30401-5500 Full Depth Reclamation: 9.45 Miles 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 31,000 TON 60201-1000 Culverts: 4000 LNFT 63501-1000 Temporary Traffic Control: LPSM https://sam.gov/opp/41053254f5d94a51b91c5dac01015992/view
UPDATES