Access the Full Project by Clicking here!
Bidjugde
JOB
Asphalt Overlay 2200
BID DATE
12/7/23 - 2:00
AGENCY
San Diego
ESTIMATE
$13,600,000
SCOPE
Work will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installment of new pavement, excavation for pavement base repair for approximately 7.23 repair miles, speed hump removal and replacement, raising appurtenances and survey monuments to grade, sweeping, installation of curb ramps to meet ADA requirements, sidewalk panel removal and replacement, curb and gutter removal and replacement, cross gutter removal and replacement, installation of new bus pads, removal and replacement of existing bus pads, commercial driveway replacement, relocation of pedestrian push buttons, installation of pedestrian barricades, root pruning, replacing traffic striping/ markings/ markers/devices, installing new bike lanes, replacing vehicle detector loops and stubs, traffic control drawings and permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City. Brittany Friedenreich 619-533-3104 bfriedenreic@sandiego.gov https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/111528

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT