Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Rio Verde Drive Water Transmission Main
BID DATE
12/18/23 - 5:00
AGENCY
Scottsdale
ESTIMATE
n/a
SCOPE
AWARD 12/18: Generally, this Water Transmission Main project will require cost estimating, value engineering and constructability review, design potholing (as needed) and construction of a portion of the IIP (approximately 4,160 linear feet (LF) of new 16” ductile iron pipe (DIP) waterline, 40 LF of new 12” DIP, 3 (three) inspection manholes, valves, water service connections, fire hydrants, air release valves (ARVs) along the Rio Verde Drive alignment. Christian Colegrove, ccolegrove@dwhomes.com https://scottsdaleaz.bonfirehub.com/opportunities/110516
UPDATES