Access the Full Project by Clicking here!
Bidjugde
JOB
Flagstaff-Cameron Hwy (ER-CCN-0(215)T)
BID DATE
02/27/15 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
$6,600,000
SCOPE
PERM PLANHOLDER LIST ADDED: The proposed work is located in Coconino County on US 89, from MP 425.80 to MP 426.70, approximately five miles north of Flagstaff. The proposed improvements consist of constructing flood mitigation measures between Copeland Avenue and Kevins Way and constructing a new channel between Kevin Way and Brandis Way to reduce the potential flooding and closure of US 89. Three sediment trap basins and two detention basins will be constructed along with the necessary culverts and channels to provide the flood mitigation measures. Additional work includes construction of a new 4 barrel 10 x 4 reinforced concrete box culvert, installing guardrail, wood and wire fence, and other miscellaneous work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT