Access the Full Project by Clicking here!
Bidjugde
JOB
East Influent Siphon
BID DATE
11/17/23 - 1:30
AGENCY
San Bernardino WD
ESTIMATE
$11,900,000
SCOPE
Furnish all material, labor and equipment required to construct the East Influent Siphon Project Phase 1 and 2. The project consists of rehabilitating two (2) existing 36-inch pipelines with Cured-In-Place-Pipe (CIPP) Liner, implementing and maintaining a temporary wastewater bypass for approximately 14-16 million gallons per day (MGD) of projected dry weather flows--including installation of cables in existing electrical duct bank conduits located on the SBWRP site, followed by demolition of the existing East Influent Siphon Structure, and construction of a replacement East Influent Siphon Structure along with other associated work as shown in the specifications for Specification No. 1821 Sydney Morrison 909-384-5393 sydney.morrison@sbmwd.org https://pbsystem.planetbids.com/portal/15845/bo/bo-detail/110997
PREBID
11/8/2023 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT