Access the Full Project by Clicking here!
Bidjugde
JOB
Residential Arterial Pavement Improvement I159 I139
BID DATE
12/13/23 - 3:00
AGENCY
Torrance
ESTIMATE
$18,750,000
SCOPE
This project is designed to provide scheduled maintenance to existing asphalt paved roadways. In areas where ponding occurs, some curb, gutter, sidewalk and tree removal/replacements will be performed prior to pavement repairs. Areas requiring additional pavement improvement will include dig-outs or cold milling and overlay. Cold milling and overlay requires the removal of the top layer (typically 2 inches) of a street and replacing it with a new layer of bituminous pavement. The cold milling and overlay process requires full closures of streets for approximately 9 to 10 hours to allow for preparation of work (e.g. street sweeping and setting up traffic control), cold milling and overlay, material curing, and clean-up. No vehicles will be allowed on the street until the work is complete. EOverstreet@TorranceCA.gov CAguilar@TorranceCA.gov https://www.torranceca.gov/Home/Components/RFP/RFP/1636/1573

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT