Bridgestone Mud Sanitary Sewer Rehabilitation Phase I
BID DATE
11/28/23 - 10:00
AGENCY
Bridgestone MUD
ESTIMATE
n/a
SCOPE
The project consists of rehabilitation of approximately 10,600 linear feet of cured-in-place pipe consisting of 12-inch, 15-inch, 21-inch, 24-inch and 30-inch sanitary sewers, 45 service reconnects, 7 service lead repairs, 1 point repair, other miscellaneous pipe repairs, pre and post-construction sanitary sewer cleaning and televising, approximately 316 vertical feet manhole rehab by grout and epoxy, and other miscellaneous manhole repairs. The project is located within Bridgestone Sections 1-6 and Bridgestone West Sections 1-2 in Bridgestone Municipal Utility District, within the City of Houston Extraterritorial Jurisdiction, Harris County Key Map 291-S, T, W, and X. https://www.civcastusa.com/project/653049ed1fa3b7e0b4f3cafe/summary nwhite@quiddity.com
PREBID
11/7/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT