Access the Full Project by Clicking here!
Bidjugde
JOB
Sidewalk Replacement Group 1902A
BID DATE
12/5/23 - 2:00
AGENCY
San Diego
ESTIMATE
$1,260,000
SCOPE
Work will involve furnishing all labor, materials, equipment, services and construction, including demolishing, hauling and disposal of the existing asphalt and concrete, removal and replacement of damaged sidewalk including root removal where applicable, curb and gutter, PCC Residential Driveways, cross gutter removal and replacement, installation of curb ramps to meet ADA standards, installation and replacement of curb outlet – type A, excavation of unsuitable base materials and asphalt pavement, tree trimming, tree root pruning, sidewalk bridging, stump removal, installment of root barriers, tree removal and replacement, storm drain inlet protection, traffic control drawings and permits. Juan E. Espindola 619-533-4491 jeespindola@sandiego.gov https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/111336

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT