Access the Full Project by Clicking here!
Bidjugde
JOB
LADWP Lagoon Refurbishment
BID DATE
12/9/14 - 2:00
AGENCY
MWD
ESTIMATE
$3,200,000
SCOPE
Construction of approximately 7,000 feet of 6-inch to 8-inch PVC pipe, 500 feet of 2-inch PVC pipe, 1,700 feet of utility ductbanks, and three maintenance holes; modification of two existing maintenance holes; installation of two standpipes, five submersible pumps and two turbidity meters; on-site screening of approximately 6,100 cubic yards of underdrain rock; disposal of approximately 2,000 cubic yards of hazardous material; installation of approximately 12,500 cubic yards of crushed rock; refurbishment of existing decant valve structures for four lagoons including asbestos and PCB abatement; installation of local electrical panels and a utility cabinet; and other appurtenant work

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT