Robert B Diemer Water Treatment Plant Basin Rehabilitation
BID DATE
12/2/14 - 2:00
AGENCY
MWD
ESTIMATE
$65,000,000
SCOPE
The work consists of removing, furnishing and installing equipment in eight flocculation/sedimentation basins including inlet gates and valves, flocculator motors/variable frequency drives, gear reducers, drive trains, shafting/arms/couplings, bearing housing and liner, paddle wheel boards, baffle wall boards and supports, clarifier motor/integral gearboxes, worm gearboxes and pinions, rakes and launders; removing, furnishing (or refurbishing) and installing clarifier turntable assemblies; removing, refurbishing and re-installing clarifier access bridges including abatement of lead paint; replacing or modifying structural support components of equipment; installing clarifier corner fillets; disposing replaced equipment; removing and disposing Polychlorinated Biphenyls (PCBs)-containing sealants and adjoining concrete; furnishing and installing launder isolation gates; removing, furnishing and replacing perimeter water lines; installing Metropolitan-furnished sludge pumps and modifying associated sludge piping; repairing spalled concrete; removing, furnishing and installing access hatches, handrails, and lights; removing, furnishing/installing or modifying electrical and control components; and performing all appurtenant work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT