Access the Full Project by Clicking here!
Bidjugde
JOB
Montage Trail Connection Collier Canyon Road
BID DATE
11/14/23 - 2:30
AGENCY
Livermore
ESTIMATE
$320,000
SCOPE
The existing Montage Trail traverses east-west adjacent to Shea Homes and terminates east of Collier Canyon Creek. The scope of work includes demolition of concrete curb, gutter, sidewalk, ADA ramps and pavement, and construction of new trail segment, asphalt concrete, sidewalk, ADA ramps, utility relocation, crosswalks, and lane striping. The Project will consist of selective demolition of concrete curb and gutter, sidewalk, curb ramps, median, asphalt concrete, storm drainpipe, storm drain catch basin, retaining wall, and traffic striping. The Project will construct new concrete curb and gutter, sidewalk, ADA curb ramps, asphaltic concrete, aggregate base, storm drainpipe, storm drain catch basin, signage, and traffic striping. Work on or adjacent to Campus Loop Road is on Las Positas Community College right of way. lbtaing@livermoreca.gov https://www.livermoreca.gov/Home/Components/RFP/RFP/1073/3256
UPDATES