Fm 619 Waterline Relocation Airport Lift Station Improvements
BID DATE
11/7/23 - 2:00
AGENCY
Taylor
ESTIMATE
n/a
SCOPE
The project work includes the following: FM 619 Base Bid: Relocation of approximately 819 linear feet of 8-inch potable water line along FM 619 between HWY 79 and CR 412, and up to 922 of linear feet of 8-inch potable water in Alternate Bids. Airport Lift Station Base Bid: Grading and berm improvements to control drainage around the lift station wet well, installation of lift station improvements and relocation of a davit crane, and in alternate bids the Installation of an 8” PVC gravity line between the two lift station wet wells and the installation of riprap to mitigate erosion of a drainage channel feeding Mustang Creek. https://www.civcastusa.com/project/6534477f5b12790ebf44eb65/summary lisa.singer@hdrinc.com