Access the Full Project by Clicking here!
Bidjugde
JOB
Trimble Road Trunk Sanitary Sewer Improvements
BID DATE
02/18/15 - 3:00
AGENCY
Santa Clara
ESTIMATE
n/a
SCOPE
The project is located within the Cities of Santa Clara and San Jose and includes construction of the following features: 1. Cured-in-place manhole (CIPM) lining rehabilitation of twenty-six (26) corroded manholes. 2. Calcium aluminate coating rehabilitation of seven (7) structures including the Guadalupe Chart Station. 3. As-needed PVC liner termination repairs on an existing 48-inch PVC pipe lined reinforced concrete gravity sewer pipeline extending from approximately 1,100- feet south of the Central Expressway and De La Cruz Boulevard intersection to the Guadalupe River. 4. Replacement of wood plank and metal lids and associated locking hardware on seven (7) manhole structures. 5. Replacement of approximately twenty-five (25)-feet of existing RCP gravity pipeline with 33-inch HDPE pipe. 6. Cured-in-place pipe (CIPP) rehabilitation of approximately 34-feet of 24-inch diameter siphon pipelines and 17-feet of 12-inch diameter air jumper pipes in De La Cruz Boulevard immediately downstream of the intersection with Central Expressway. 7. CIPP rehabilitation of approximately 122-feet of 24-inch diameter siphon pipes and 125-feet of 8-inch diameter air jumpers located immediately upstream of Highway 101. 8. CIPP rehabilitation of approximately 1,205-feet of 33-inch diameter pipelines crossing Highway 101. 9. CIPP rehabilitation of approximately 4,513 feet of 48-inch gravity pipeline between the Guadalupe River and the Trimble Road/North First Street intersection. 10. Cured-in-place manhole lining (CIPML) rehabilitation of twenty-six (26) corroded manholes in the existing pipeline between the De La Cruz Boulevard/Martin Avenue intersection and the Trimble Road/North First Street intersection. 11. Approximately 1,177 linear feet of 48-inch C905 PVC and 321 linear feet of 54- inch HDPE DR 21 gravity sewer in Trimble Road between North First Street and Zanker Road, including a new connection with City of San Jose Interceptor No. 3 at Zanker Road, PVC-lined manholes, and a trenchless crossing beneath the Santa Clara Valley Transportation Authority’s light-rail tracks at North First Street. Contact: Evelyn Liang Email: eliang@santaclaraca.gov Phone: (408) 615-3013 Fax: (408) 985-7936
PREBID
1/29/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT