Access the Full Project by Clicking here!
Bidjugde
JOB
Sharpstown Trail Phase 1 From Beechnut St Sands Point Dr
BID DATE
11/21/23 - 12:00
AGENCY
Harris County
ESTIMATE
$2,300,000
SCOPE
The project consists of the construction of a 10' wide concrete trail through a CenterPoint easement from Beechnut Street to Sands Point Drive. Includes planting of trees and shrubs, installation of curb ramps, crosswalk and trail striping, wooden post with wire fence, and roadway and trail signing. Bid also includes alternatives for a HAWK signal crossing at S Gessner Road and the removal of a dedicated right turn lane at Bellaire Boulevard and S Gessner Road. Construction in, on, or near existing roadways will require a Traffic Control Plan. Construction also requires the implementation of Storm Water Pollution Prevention Plan and features. Disposal of any excess material and debris is the responsibility of the contractor. All disturbed areas are to be hydro-mulch seeded as indicated on plans. https://www.civcastusa.com/project/65319639e93337619600865a/summary lisagraiff@houstparksboard.org
PREBID
11/2/2023 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT