Access the Full Project by Clicking here!
Bidjugde
JOB
Madison Park Academy Asphalt Removal Replacement
BID DATE
10/25/23 - 2:00
AGENCY
Oakland Unified School District
ESTIMATE
$165,880
SCOPE
Removing and replacing approximately 14,000.00 square feet of asphalt in parking lot area. Area 1: Garbage Damaged Area needs Saw cut, demolish and excavate approximately of 250 square feet of failed payment to depth of 10 inches and transport spoils to recycling center. Regrade and compact subgrade, Place 4 inches of class 2 base rock, set forms, dry fit dowels # 4 reinforcement steel bars at 18 inches on center each way. Pour and finish approximately 250 feet of 6-inch thick concrete slab. Use colorless 3,000 P.S.I. concrete mix with medium broom finish. Excludes application of concrete sealer. Area 2: Parking area needs remove and replace approximately 12,123 square feet of failed pavement to the depth of 4 inches and transport spoils to recycling center. Compact existing base rock, apply tack oil along perimeter edges, then provide, place and compact 6 inches on center drive area where trucks enter and exits approximately 4,000 feet. Place 3 inches of hot asphalt on parking areas approximately 8,123 of 1/2-inch medium hot mix asphalt. Remove and replace approximately 35- 4-inch wheel stops in the parking stalls. marcus.board@ousd.org https://www.ipdservices.com/clients/eastbay/?Oakland%20USD&Show=Planroom&Project=OUSD+70028+-+Madison+Park+Academy+Asphalt+Removal+and+Replacement+Project
PREBID
10/20/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT