Access the Full Project by Clicking here!
Bidjugde
JOB
Payson City Main Street
BID DATE
11/30/23 - 2:00
AGENCY
Payson UT
ESTIMATE
n/a
SCOPE
Main Street from SR-198 to 700 South will be reconstructed and the sewer, culinary water, pressurized irrigation water, and storm drain utilities will be replaced and added to. There is an existing concrete road under the asphalt and this will have to be removed as part of the project. The downtown two blocks will have to have the concrete saw cut to remove and special compaction methods used in conjuction with seismic monitoring to prevent damage to the old buildings. Travis Jockumsen +1 801-465-5235 travisj@payson.org
UPDATES