(CMAR) Stapley Dr University Dr Roadway Intersection Improvements
BID DATE
11/16/23 - 2:00
AGENCY
Mesa
ESTIMATE
$20,000,000
SCOPE
Roadway widening for three new right turn lanes at the University and Stapley intersection. Pavement reconstruction from Mesa Drive to Harris along University Drive and from approximately 200 feet north of Main Street to 8th Street, including related street improvements such as streetlights, bus stops, storm drain pipe, catch basins, ADA improvement for sidewalks, ramps, and driveways. Improvements may include various other miscellaneous improvements to support this project. Removal and replacement of new traffic signals including related fiber, conduit, conductors, etc., at each of the following intersections: • University and Lazona • University and Harris • University and Horne • University and Stapley Anticipated utility improvements include gas, water, sewer, and electrical upgrades along the project limits, including coordination with third party utilities such as SRP, Cox, CenturyLink, and others. Gas construction includes replacement of steel pipe and PE gas; a new high-pressure stub into the Rogers Sub-Station, and other miscellaneous gas items as needed. Water and sewer construction includes removal and replacement of existing water services, meters, fire hydrants, etc. as needed to accommodate the roadway improvements; installation of new 12" DIP water line, and manhole or sewer line improvements required at project intersections with Harris and Main Street. Electrical improvements include 69KV pole replacement and/or relocations as required to widen the major intersection and other related work along the project limits. Tracy.Gumeringer@mesaaz.gov
UPDATES