Access the Full Project by Clicking here!
Bidjugde
JOB
Midtown Fresno Trail McKinley Ave Gap Closure Midtown Trail Segment 4
BID DATE
11/14/23 - 3:00
AGENCY
Fresno
ESTIMATE
n/a
SCOPE
The scope of work includes but is not limited to; Installation of a 3.5 mile pedestrian and cycling trail along the Mill Ditch as part of a 7.1 mile network of trails known as the Metropolitan Trails System or Metro Trails. This trail will be constructed along Mill Ditch, on the south side of segments. This will create a major trail loop in the central part of our community. This project will include minor roadway and crossing improvements, ADA ramp upgrades, utility relocations, installation of amenities such as benches, street, and trail lighting, drinking fountains, trash receptacles, bicycle racks, dog waste stations, signage, striping, landscaping and irrigation. James E Jackson 559-621-1165 James.Jackson2@fresno.gov https://pbsystem.planetbids.com/portal/14769/bo/bo-detail/110805#bidInformation
PREBID
10/25/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT