Access the Full Project by Clicking here!
Bidjugde
JOB
East Aztec Arterial Phase 1b Road Construction
BID DATE
02/19/15 - 2:00
AGENCY
Aztec
ESTIMATE
n/a
SCOPE
The work under this contract is located in or adjacent to the City of Aztec, New Mexico. The work consists of 2.8 miles of earthwork, base course, HMA, drainage structures, metal barrier, riprap erosion control, signing and striping. 0.7 miles of asphalt overlay and striping, and furnishing all equipment, labor and materials for the construction of the East Aztec Arterial Route, Phase IB, as specified in the construction documents
PREBID
1/29/2015 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT