Access the Full Project by Clicking here!
Bidjugde
JOB
Wastewater Collection System Lift Station No. 7 Replacement
BID DATE
05/18/15 - 2:00
AGENCY
Dona Ana County
ESTIMATE
n/a
SCOPE
The project consist of the construction of a new 10’ diameter lift station, 10” PVC C900 forcemain, and 10” PVC gravity collection line. The existing lift station equipment will salvaged to the owner and be transitioned to a gravity collection manhole to redirect existing gravity flows to the new lift station. The new Lift Station #7 will also allow for the North Lift Station to be taken offline as those gravity flows will be redirected to the new Lift Station #7. The existing 6” force main from the North Lift Station will be utilized by the new Lift Station #7 Bohannan Huston, Inc., 425 S. Telshor Blvd. Suite C- 103, Las Cruces NM, telephone 575-532-8670, facsimile 575-532-8670, contact Diana Gomez at dgomez@bhinc.com , or Michelle Brown at mbrown@bhinc.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT