Access the Full Project by Clicking here!
Bidjugde
JOB
Rittenhouse Road Phase II
BID DATE
02/24/15 - 2:00
AGENCY
Queen Creek
ESTIMATE
n/a
SCOPE
PLANHOLDER ADDED: Rittenhouse Road will be reconstructed from Sossaman Road to approximately the Queen Creek Road alignment northwest of Ellsworth Loop Road to provide two travel lanes and a bike lane in each direction and a raised median. Sidewalks, hardscape elements, and landscape will also be constructed along the south side of the roadway. Major elements of the project include furnishing all labor, tools, materials, equipment and any other incidentals necessary to widen Rittenhouse Road, remove and replace the subgrade and asphalt along Rittenhouse Road at the locations shown in the plans, retention basin and storm drain construction, irrigation pipeline construction, joint trench construction, curb and gutter construction, sidewalk construction, utility and conduit trenching, street lighting, traffic signal improvements, and landscape installation. Thomas T. Narva, Sr. Sr. Project Manager / CIP (480)358-3137 tom.narva@queencreek.org
PREBID
2/11/2015 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT