Access the Full Project by Clicking here!
Bidjugde
JOB
Cave Springs Bank Stabilization
BID DATE
11/13/23 - 11:00
AGENCY
Department Agriculture
ESTIMATE
$1,000,000
SCOPE
Replace the existing grouted riprap streambank structure on Oak creek adjacent to the campground with a stepped, concrete wall extending into the bed of the stream. This project would also improve the campground access road by stabilizing the low-water crossing to prevent undercutting. This project is necessitated by repeated failures of portions of the existing riprap structure and undermining of the existing low-water crossing. https://sam.gov/opp/8c8cbf1a584a4b0bad4953dcffda3139/view veronica.beck@usda.gov
UPDATES